Thursday, 27 January 2011
First We Change The Rotten Felt On The Bottom Lift With Breathable Felt And Tanalised 2"x 1" Battens, Remove Rotten End Raffters, Replace With 4" x 2" Tanalised Raffters, Remove 3 Rows Of Tiles From Up And Down Both Sides Of All Pine Ends, Fit Dry Verge To New End Raffters, Cut Tiles Back Into Dry Verge, Remove All Old Wooden Fascia And Soffitt, Replace With 20mm Upvc Fascia Board In Woodgrain With Woodgrain Soffitt And Brown Gutters And Down Pipes, And Brown Dry Verge, Refit Ridge Tiles.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment